The project library.
Practical details, worked examples, and the questions to ask before you buy.
Planning guides
Board-and-batten spacing: equal gaps and edge boards
Set the end boards, calculate the clear gaps, and check the layout against outlets, furniture, and existing trim.
Read the guide ↗Trim cut lists: allow for saw kerf, end trim and offcuts
Account for blade loss, end cleanup, and the lengths that will actually fit on each board.
Read the guide ↗How much paint do I need? Wall area, coats and can sizes
A worked room estimate showing wall area, openings, two coats, coverage, and the final can count.
Read the guide ↗Fence materials: count posts, pickets, rails and concrete
Follow a fence around its corners and gates to count bays, shared posts, pickets, and rail pieces.
Read the guide ↗Wood vs. composite decking: compare 10-year costs
Compare initial quotes and scheduled upkeep, then change the maintenance assumption to see whether the result holds.
Read the guide ↗Two contractor quotes, one scope of work
Find the allowances, exclusions, and missing quantities that can change which quote costs less.
Read the guide ↗Choose storage bins that hold your things and stay easy to lift
Test the inside bottom, loaded weight and daily retrieval before ordering matching containers. Exterior fit is only the first check.
Read the guide ↗A DIY budget that fits the money available
Price the complete job, leave a cash reserve, and decide which expense to remove when the total exceeds your limit.
Read the guide ↗Board-and-batten spacing around outlets: a measurement worksheet
Map the things already on the wall, test complete board positions, and choose a layout before making a cut list.
Read the guide ↗Compare 8-foot and 10-foot trim boards by cut-list cost
Compare eight- and ten-foot stock against a complete no-splice cutting plan, including kerf, end cleanup, and transport.
Read the guide ↗Room-by-room paint worksheet: colors, coats and gallons
Measure each wall once, allocate openings to the right color, and see how label coverage changes the can count.
Read the guide ↗Contractor quote allowances: compare materials, fees and tax
Work through a complete two-quote comparison without treating an allowance as final, adding included tax twice, or hiding unpriced work.
Read the guide ↗Board-and-batten example: a 140-inch wall with an outlet
Follow one measured wall from six openings and an outlet conflict to five openings, a no-join cut list, and a six-board purchase.
Read the guide ↗Storage bin fit and pack costs: a two-shelf worked example
Use actual bin dimensions to check orientation and access, then turn the needed count into a purchase quantity with illustrative pack prices.
Read the guide ↗